Power Tek Testing Services
Power Tek provides consulting and testing services to power generation
facilities owners and engineer-procure-construct (EPC) contractors.
Our engineering services consist of services to enhance power plant
design, commissioning, testing and improve operations and maintenance
for existing and new power generation facilities. Our focus is to provide
our clients with the required expertise to exceed their contract requirements
for their power projects. The engineering, startup and testing personnel
are experienced in the many facets of power plant turnkey projects
and can provide the expertise to solve the problems and enhance the
project schedule that results in savings to our clients.
Power Tek has extensive experience in the performance and acceptance
testing arenas. Our experience will be one of the resources used to provide
quick resolution to problems and contract or engineering issues. We understand
that the schedule is important to the owner as well as the contractor
and will expedite any information required to complete the project. A
project which does not meet schedule milestones and experiences schedule
liquidated damages is detrimental to both the Contractor and the Owner.
Power Tek has assisted many projects in meeting project schedule milestones
and assisting the project participants to meet the project goals.
Power Tek has assisted EPC Contractors and Owners to meet or exceed
schedule and financial goals for the following projects:
Provided third party performance testing services to Sargent and Lundy
and Southern Illinois Power Coop Circulating Fluidized Bed Repowering
(CFB) Project for Units 1 through 3 in Marion, Illinois in 2003. The
Foster Wheeler Corporation is capable of supplying sufficient steam to
generate 130 megawatts from Units 1-3 existing Steam Turbines. Power
Tek conducted the performance test for the CFB to ensure the output,
boiler efficiency and other guarantees were met. Worked with the owner,
Sargent and Lundy, and Foster Wheeler operations and test personnel to
ensure the units performance would be in accordance with contract requirements.
Power Tek performed the boiler efficiency and the additional tests for
the acceptance of the units by the owner.
Served as Startup Manager and Consulting Services to Burns & McDonnell
for the Rio Bravo and Rosarito Projects in Mexico and the Zeeland Project
in Zeeland, Michigan. The project consisted of simple cycle GE 7 FA Combustion
Turbine and auxiliary equipment. Power Tek provided the coordination
of the environmental, performance and environmental testing for the project
and the final performance and environmental test report. Conducted the
performance test and worked with GE performance testing personnel on
the resolution of performance problems.
Provided startup support and consulting to Duke/Fluor Daniel for the
Ingleside Cogeneration Project in Corpus Christi, Texas. The unit consisted
of two GE Frame 7 FA Combustion Turbines and an ABB Steam Turbine. Reviewed
the schedule and provided input to enhance the time required to complete
the overall project.
Conducted training classes for Duke Fluor Daniel design and project
personnel on value engineering and project cost reduction for solid fuel,
simple and combined cycle gas turbine turnkey projects.
Provided Testing and Consulting Services for Burns & McDonnell for
the Tenaska Lakefield Junction Project. The Project consisted of furnishing
the instrumentation, conducting the performance test and writing the
test report for six (6) GE 7 EA Simple Cycle Gas Turbines. The Owner
required that testing be completed at base load on oil and gas and peak
load on gas.
Provided Performance and Testing Services to Sargent and Lundy for the
Reliant Energy Project in Aurora, Illinois. The project consisted of
providing the Test Director and testing personnel to conduct performance
tests for three (3) GE 7 FA simple cycle gas turbines and six (6) LM-6000’s
and coordinate the activities of the environmental test company.
Provided Performance and Testing Services to Duke Fluor Daniel for El
Paso Energy’s West Georgia Generating for the Acceptance and Performance
Testing in Thomaston, Georgia. The project consisted of providing a Startup
and Testing Specialist for setup and conducting the performance test
for four (4) General Electric GE 7FA simple cycle gas turbines.
Provided Performance and Testing Services to the Olinger Simple Cycle
Project in Nevada, Texas. The project consisted of providing the Test
Director and testing personnel to conduct performance tests and write
the performance test report for a GE 7 EA simple cycle gas turbine.
Provided Performance and Testing Services to the CMS Dearborn Industrial
Generation Project in Dearborn, Michigan. The project consisted of providing
a Startup and Testing Specialist to conduct performance tests for GE
7 FA gas turbines and two (2) blast furnace gas boilers for power generation.
Provided Performance and Testing Services to the Hamakua Combined Cycle
Project in Hamakua, Hawaii. The project consisted of providing the Test
Director and testing personnel to conduct performance tests and write
the performance test report for a GE LM-2500 combined cycle gas turbine
project.
Provided the Test Director and led the Babcock and Wilcox and Toshiba
Test Team for a performance test for the Coastal Saba Power Project in
Farooqabad, Pakistan. Worked with the Babcock and Wilcox Test Team to
prepare the test report and make the presentation to Coastal Power. The
project consisted of performance testing and consulting for 150 MW oil
fired conventional boiler and steam turbine test for acceptance by the
owner.
Provided the Test Director and Test Personnel for the performance testing
of the Mirant Zeeland Simple Cycle Project in Zeeland, Michigan. Power
Tek conducted the performance test for the two (2) unit simple cycle
GE 7FA gas turbines. Worked with the client and GE test personnel to
ensure the units performance would be in accordance with contract requirements.
Power Tek performed the annual Maximum Output Capacity Test for the recertification
of the units for the power grid.
Provided Performance and Testing Services to Duke Fluor Daniel for the
Duke Energy’s Arlington Valley Generation Project for the Acceptance
and Performance Testing in Tonapah, Arizona. The project consisted of
providing a Startup and Testing Specialist for setup and conducting the
performance test for two-on-one combined cycle project. The project consisted
of two (2) General Electric GE 7FA gas turbine generators, two (2) Aalborg
HRSG’s and a GE D11 Steam.
Provided Startup Support, Test Director and Test Personnel for the startup
and performance testing of the Bayswater Peaking Project in Bayswater,
New York. Power Tek conducted the performance test for a Pratt & Whitney
FT-8 as turbine. Coordinated Pratt & Whitney, Foster Wheeler and
Florida Power personnel to ensure the units startup documents, startup
and performance would be in accordance with contract requirements.
Witnessed and provided additional unit data for the Acceptance Test
for the Nebo Power Project in Payson, Utah. The unit was a one-on-one
GE 7EA Gas Turbine a Nooter Eriksen Heat Recovery Steam Generator (HRSG)
and a GE Steam Turbine Generator. Power Tek provided Auxiliary, Net Power
data, and ambient data for the acceptance and performance testing of
the unit
Provided third party performance testing services to Sargent and Lundy
for Units 2 and 3 at the City of Grand Island Burdick Power Project in
Grand Island Nebraska in 2003. Power Tek conducted the performance test
for the two (2) unit simple cycle GE 6B gas turbines designed and manufactured
in France. Worked with the client, the owner and GE test personnel to
ensure the units performance would be in accordance with contract requirements.
Power Tek performed the Maximum Output Capacity and the Heat Rate Test
for the acceptance of the units by the owner.
Provided the Test Director and Test Personnel for the annual performance
testing of the Mirant Zeeland Simple Cycle Project in Zeeland, Michigan
in 2002, 2003,2004 and 2005. Power Tek conducted the annual performance
test for the two (2) unit simple cycle GE 7FA gas turbines. Worked with
the client and the Duke Energy who is the power purchaser to ensure the
units performance would be in accordance with contract requirements.
Power Tek performed the annual Maximum Output Capacity Test for the recertification
of the units for the power grid.
Provided third party performance testing services to Sargent and Lundy
for Units 5 and 6 at the Southern Illinois Power Coop Simple Cycle Project
in Marion, Illinois in 2003. Power Tek conducted the performance test
for the two (2) unit simple cycle GE 7E gas turbines designed and manufactured
by General Electric. Worked with the client, the owner and GE test personnel
to ensure the units performance would be in accordance with contract
requirements. Power Tek performed the Maximum Output Capacity and the
Heat Rate Test for the acceptance of the units by the owner.
Provided the Test Director and Test Personnel for a ASME PTC 46 Overall
Performance Test and individual Component Tests of the Trans Alta Big
Hanaford Combined Cycle Project in Centralia, Washington in 2003. Power
Tek conducted the Overall Performance Test and individual Equipment Performance
Tests a combined cycle unit with four (4) GE LM6000 gas turbines designed
and manufactured by General Electric, four (4) Innovative Steam Technologies
Heat Recovery Steam Generators (HRSG’s) and a Mitsubishi Steam Turbine
. Worked with the client, the owner and GE test personnel to ensure the
units performance would be in accordance with contract requirements.
Power Tek performed the fired and unfired PTC-46 Overall Performance
Test for Power Output and the Heat Rate. In addition, Power Tek conducted
individual component tests on the Gas Turbines, HRSG’s, Steam Turbine
and the Condenser/Cooling Tower.
Provided third party performance testing services to Sargent and Lundy
and Southern Illinois Power Coop Circulating Fluidized Bed Repowering
(CFB) Project for Units 1 through 3 in Marion, Illinois in 2003. The
Foster Wheeler Corporation is capable of supplying sufficient steam
to generate 130 megawatts from Units 1-3 existing Steam Turbines. Power
Tek conducted the performance test for the CFB to ensure the output,
boiler efficiency and other guarantees were met. Worked with the owner,
Sargent and Lundy, and Foster Wheeler operations and test personnel
to ensure the units performance would be in accordance with contract
requirements. Power Tek performed the boiler efficiency and the additional
tests for the acceptance of the units by the owner.
Provided third party performance testing services to EDG Power Group
for Combustion Turbine One at the City of Fremont Department of Utilities
and the Fremont Power Project in Fremont, Nebraska in 2003. Power Tek
conducted the performance test for the one (1) unit simple cycle GE 6B
gas turbines designed and manufactured in France. Worked with the client,
the owner and GE test personnel to ensure the units performance would
be in accordance with contract requirements. Power Tek performed the
Maximum Output Capacity and the Heat Rate Test for the acceptance of
the units by the owner.
Provided third party performance testing services for Colorado Energy
and Utah Associated Municipal Power Systems for at the NEBO Combined
Cycle Project in Payson, Utah in 2004. Power Tek conducted the performance
test for the GE 7EA one-on-one combined cycle unit with a GE Steam Turbine
and a Nooter Eriksen Heat Recovery Steam Generator. Worked with the Client,
the owner and GE test personnel to ensure the units performance would
be in accordance with contract requirements. Power Tek performed the
Maximum Output Capacity and the Heat Rate Test for the acceptance of
the units by the owner.
Provided before and after outage performance tests for Texas Genco (formerly
Houston Lighting & Power) for San Jacinto Steam Electric Unit in
Dear Park, Texas in 2004. Power Tek conducted the performance test for
the GE 7EA steam electric unit with a GE 7EA Combustion Turbine and a
Deltak Single Pressure Heat Recovery Steam Generator which furnishes
process steam to Dupont. Power Tek performed the test per the requirements
of the owner which consisted of a Maximum Output Capacity and the Heat
Rate Test for the owner.
Provided the Test Director and Test Personnel for the annual performance
testing of the Mirant Zeeland Combined Cycle Project in Zeeland, Michigan
in April 2005. Power Tek conducted the annual performance test for the
two (2) unit simple cycle GE 7FA gas turbines, two ( 2) Vogt HRSG’s and
a GE D11 Steam Turbine. Worked with the client to ensure the units performance
would be in accordance with contract requirements of the Power Sales
Agreement. Power Tek modeled the facility to assist in the evaluation
of the performance of the facility in the unfired and fired modes. Power
Tek performed the annual Maximum Output Capacity Test and Plant Heat
Rate Test for the certification of the units for the power grid.
Qualifications
|