Power Tek Testing Services


Power Tek provides consulting and testing services to power generation facilities owners and engineer-procure-construct (EPC) contractors. Our engineering services consist of services to enhance power plant design, commissioning, testing and improve operations and maintenance for existing and new power generation facilities. Our focus is to provide our clients with the required expertise to exceed their contract requirements for their power projects. The engineering, startup and testing personnel are experienced in the many facets of power plant turnkey projects and can provide the expertise to solve the problems and enhance the project schedule that results in savings to our clients.

Power Tek has extensive experience in the performance and acceptance testing arenas. Our experience will be one of the resources used to provide quick resolution to problems and contract or engineering issues. We understand that the schedule is important to the owner as well as the contractor and will expedite any information required to complete the project. A project which does not meet schedule milestones and experiences schedule liquidated damages is detrimental to both the Contractor and the Owner. Power Tek has assisted many projects in meeting project schedule milestones and assisting the project participants to meet the project goals.

Power Tek has assisted EPC Contractors and Owners to meet or exceed schedule and financial goals for the following projects:

Provided third party performance testing services to Sargent and Lundy and Southern Illinois Power Coop Circulating Fluidized Bed Repowering (CFB) Project for Units 1 through 3 in Marion, Illinois in 2003. The Foster Wheeler Corporation is capable of supplying sufficient steam to generate 130 megawatts from Units 1-3 existing Steam Turbines. Power Tek conducted the performance test for the CFB to ensure the output, boiler efficiency and other guarantees were met. Worked with the owner, Sargent and Lundy, and Foster Wheeler operations and test personnel to ensure the units performance would be in accordance with contract requirements. Power Tek performed the boiler efficiency and the additional tests for the acceptance of the units by the owner.

Served as Startup Manager and Consulting Services to Burns & McDonnell for the Rio Bravo and Rosarito Projects in Mexico and the Zeeland Project in Zeeland, Michigan. The project consisted of simple cycle GE 7 FA Combustion Turbine and auxiliary equipment. Power Tek provided the coordination of the environmental, performance and environmental testing for the project and the final performance and environmental test report. Conducted the performance test and worked with GE performance testing personnel on the resolution of performance problems.

Provided startup support and consulting to Duke/Fluor Daniel for the Ingleside Cogeneration Project in Corpus Christi, Texas. The unit consisted of two GE Frame 7 FA Combustion Turbines and an ABB Steam Turbine. Reviewed the schedule and provided input to enhance the time required to complete the overall project.

Conducted training classes for Duke Fluor Daniel design and project personnel on value engineering and project cost reduction for solid fuel, simple and combined cycle gas turbine turnkey projects.

Provided Testing and Consulting Services for Burns & McDonnell for the Tenaska Lakefield Junction Project. The Project consisted of furnishing the instrumentation, conducting the performance test and writing the test report for six (6) GE 7 EA Simple Cycle Gas Turbines. The Owner required that testing be completed at base load on oil and gas and peak load on gas.

Provided Performance and Testing Services to Sargent and Lundy for the Reliant Energy Project in Aurora, Illinois. The project consisted of providing the Test Director and testing personnel to conduct performance tests for three (3) GE 7 FA simple cycle gas turbines and six (6) LM-6000’s and coordinate the activities of the environmental test company.

Provided Performance and Testing Services to Duke Fluor Daniel for El Paso Energy’s West Georgia Generating for the Acceptance and Performance Testing in Thomaston, Georgia. The project consisted of providing a Startup and Testing Specialist for setup and conducting the performance test for four (4) General Electric GE 7FA simple cycle gas turbines.

Provided Performance and Testing Services to the Olinger Simple Cycle Project in Nevada, Texas. The project consisted of providing the Test Director and testing personnel to conduct performance tests and write the performance test report for a GE 7 EA simple cycle gas turbine.

Provided Performance and Testing Services to the CMS Dearborn Industrial Generation Project in Dearborn, Michigan. The project consisted of providing a Startup and Testing Specialist to conduct performance tests for GE 7 FA gas turbines and two (2) blast furnace gas boilers for power generation.

Provided Performance and Testing Services to the Hamakua Combined Cycle Project in Hamakua, Hawaii. The project consisted of providing the Test Director and testing personnel to conduct performance tests and write the performance test report for a GE LM-2500 combined cycle gas turbine project.

Provided the Test Director and led the Babcock and Wilcox and Toshiba Test Team for a performance test for the Coastal Saba Power Project in Farooqabad, Pakistan. Worked with the Babcock and Wilcox Test Team to prepare the test report and make the presentation to Coastal Power. The project consisted of performance testing and consulting for 150 MW oil fired conventional boiler and steam turbine test for acceptance by the owner.

Provided the Test Director and Test Personnel for the performance testing of the Mirant Zeeland Simple Cycle Project in Zeeland, Michigan. Power Tek conducted the performance test for the two (2) unit simple cycle GE 7FA gas turbines. Worked with the client and GE test personnel to ensure the units performance would be in accordance with contract requirements. Power Tek performed the annual Maximum Output Capacity Test for the recertification of the units for the power grid.

Provided Performance and Testing Services to Duke Fluor Daniel for the Duke Energy’s Arlington Valley Generation Project for the Acceptance and Performance Testing in Tonapah, Arizona. The project consisted of providing a Startup and Testing Specialist for setup and conducting the performance test for two-on-one combined cycle project. The project consisted of two (2) General Electric GE 7FA gas turbine generators, two (2) Aalborg HRSG’s and a GE D11 Steam.

Provided Startup Support, Test Director and Test Personnel for the startup and performance testing of the Bayswater Peaking Project in Bayswater, New York. Power Tek conducted the performance test for a Pratt & Whitney FT-8 as turbine. Coordinated Pratt & Whitney, Foster Wheeler and Florida Power personnel to ensure the units startup documents, startup and performance would be in accordance with contract requirements.

Witnessed and provided additional unit data for the Acceptance Test for the Nebo Power Project in Payson, Utah. The unit was a one-on-one GE 7EA Gas Turbine a Nooter Eriksen Heat Recovery Steam Generator (HRSG) and a GE Steam Turbine Generator. Power Tek provided Auxiliary, Net Power data, and ambient data for the acceptance and performance testing of the unit

Provided third party performance testing services to Sargent and Lundy for Units 2 and 3 at the City of Grand Island Burdick Power Project in Grand Island Nebraska in 2003. Power Tek conducted the performance test for the two (2) unit simple cycle GE 6B gas turbines designed and manufactured in France. Worked with the client, the owner and GE test personnel to ensure the units performance would be in accordance with contract requirements. Power Tek performed the Maximum Output Capacity and the Heat Rate Test for the acceptance of the units by the owner.

Provided the Test Director and Test Personnel for the annual performance testing of the Mirant Zeeland Simple Cycle Project in Zeeland, Michigan in 2002, 2003,2004 and 2005. Power Tek conducted the annual performance test for the two (2) unit simple cycle GE 7FA gas turbines. Worked with the client and the Duke Energy who is the power purchaser to ensure the units performance would be in accordance with contract requirements. Power Tek performed the annual Maximum Output Capacity Test for the recertification of the units for the power grid.

Provided third party performance testing services to Sargent and Lundy for Units 5 and 6 at the Southern Illinois Power Coop Simple Cycle Project in Marion, Illinois in 2003. Power Tek conducted the performance test for the two (2) unit simple cycle GE 7E gas turbines designed and manufactured by General Electric. Worked with the client, the owner and GE test personnel to ensure the units performance would be in accordance with contract requirements. Power Tek performed the Maximum Output Capacity and the Heat Rate Test for the acceptance of the units by the owner.

Provided the Test Director and Test Personnel for a ASME PTC 46 Overall Performance Test and individual Component Tests of the Trans Alta Big Hanaford Combined Cycle Project in Centralia, Washington in 2003. Power Tek conducted the Overall Performance Test and individual Equipment Performance Tests a combined cycle unit with four (4) GE LM6000 gas turbines designed and manufactured by General Electric, four (4) Innovative Steam Technologies Heat Recovery Steam Generators (HRSG’s) and a Mitsubishi Steam Turbine . Worked with the client, the owner and GE test personnel to ensure the units performance would be in accordance with contract requirements. Power Tek performed the fired and unfired PTC-46 Overall Performance Test for Power Output and the Heat Rate. In addition, Power Tek conducted individual component tests on the Gas Turbines, HRSG’s, Steam Turbine and the Condenser/Cooling Tower.

Provided third party performance testing services to Sargent and Lundy and Southern Illinois Power Coop Circulating Fluidized Bed Repowering (CFB) Project for Units 1 through 3 in Marion, Illinois in 2003. The Foster Wheeler Corporation is capable of supplying sufficient steam to generate 130 megawatts from Units 1-3 existing Steam Turbines. Power Tek conducted the performance test for the CFB to ensure the output, boiler efficiency and other guarantees were met. Worked with the owner, Sargent and Lundy, and Foster Wheeler operations and test personnel to ensure the units performance would be in accordance with contract requirements. Power Tek performed the boiler efficiency and the additional tests for the acceptance of the units by the owner.

Provided third party performance testing services to EDG Power Group for Combustion Turbine One at the City of Fremont Department of Utilities and the Fremont Power Project in Fremont, Nebraska in 2003. Power Tek conducted the performance test for the one (1) unit simple cycle GE 6B gas turbines designed and manufactured in France. Worked with the client, the owner and GE test personnel to ensure the units performance would be in accordance with contract requirements. Power Tek performed the Maximum Output Capacity and the Heat Rate Test for the acceptance of the units by the owner.

Provided third party performance testing services for Colorado Energy and Utah Associated Municipal Power Systems for at the NEBO Combined Cycle Project in Payson, Utah in 2004. Power Tek conducted the performance test for the GE 7EA one-on-one combined cycle unit with a GE Steam Turbine and a Nooter Eriksen Heat Recovery Steam Generator. Worked with the Client, the owner and GE test personnel to ensure the units performance would be in accordance with contract requirements. Power Tek performed the Maximum Output Capacity and the Heat Rate Test for the acceptance of the units by the owner.

Provided before and after outage performance tests for Texas Genco (formerly Houston Lighting & Power) for San Jacinto Steam Electric Unit in Dear Park, Texas in 2004. Power Tek conducted the performance test for the GE 7EA steam electric unit with a GE 7EA Combustion Turbine and a Deltak Single Pressure Heat Recovery Steam Generator which furnishes process steam to Dupont. Power Tek performed the test per the requirements of the owner which consisted of a Maximum Output Capacity and the Heat Rate Test for the owner.

Provided the Test Director and Test Personnel for the annual performance testing of the Mirant Zeeland Combined Cycle Project in Zeeland, Michigan in April 2005. Power Tek conducted the annual performance test for the two (2) unit simple cycle GE 7FA gas turbines, two ( 2) Vogt HRSG’s and a GE D11 Steam Turbine. Worked with the client to ensure the units performance would be in accordance with contract requirements of the Power Sales Agreement. Power Tek modeled the facility to assist in the evaluation of the performance of the facility in the unfired and fired modes. Power Tek performed the annual Maximum Output Capacity Test and Plant Heat Rate Test for the certification of the units for the power grid.


 