Testing Services
PowerTek has assisted EPC Contractors and
Owners to meet or exceed schedule and financial goals for the following
projects:
Served as the Project Director for the NRG Energy Somerset
relocation and reinstallation of a Pratt & Whitney FT-4 Combustion
Turbine from Somerset, Massachusetts to Burlington, Vermont. The project scope included the
evaluation of
equipment, disassembly, moving, site preparation, piling, foundations,
reassembly, refurbishment, checkout, commissioning and startup and turnover
of the unit to the operations group. The project was completed and
operational in thirty days from start to finish.
Served
as Startup Manager and Consulting Services to Burns & McDonnell
for the Rio Bravo and Rosarito Projects in Mexico and the Zeeland
Project in
Zeeland, Michigan. The project consisted of simple cycle GE 7 FA Combustion
Turbine and auxiliary equipment. PowerTek provided the coordination of the
environmental, performance and environmental testing for the project and the
final performance and environmental test report. Conducted the performance
test and worked with GE performance testing personnel on the resolution of
performance problems.
Served as Startup Manager and Consulting Services to Duke/Fluor Daniel for
the Dearborn Simple Cycle Project Phase 1. The project consisted of simple
cycle GE
Combustion Turbine and auxiliary equipment. Supervised the construction
support and startup team, which assisted in achieving first fire of
combustion turbine within nine days of setting the turbine on the
foundation.
Provided startup support and consulting to Duke/Fluor Daniel for the
Ingleside Cogeneration Project in Corpus Christi, Texas. The unit consisted
of two GE Frame 7 FA Combustion Turbines and an ABB Steam Turbine. Reviewed
the schedule and provided input to enhance the time required to complete the
overall project.
Provided operations and maintenance consulting and evaluation of the TMPA
Gibbon's Creek Electric Generating Station, with water quality and
performance
degradation on a 480 MW GE turbine with a Combustion Engineering boiler. In
addition, provided a condition assessment of the facility as part of an
effort to determine the value of the asset to the various owners.
Conducted training classes for Duke Fluor Daniel design and project
personnel on value engineering and project cost reduction for solid fuel,
simple and combined
cycle gas turbine turnkey projects.
Provided Testing and Consulting Services for Burns & McDonnell
for the Tenaska Lakefield Junction Project. The Project consisted of furnishing the
instrumentation, conducting the performance test and writing the. test
report for six (6) GE 7 EA Simple Cycle Gas Turbines. The Owner required
that testing be completed at base load on oil and gas and peak load on gas.
Provided Performance and Testing Services to Sargent and Lundy for the
Reliant Energy Project in Aurora, Illinois. The project consisted of
providing the Test Director and test personnel to conduct performance tests
for three (3) GE 7 FA simple cycle gas turbines and six (6) LM-6000s and
coordinate the activities of the environmental test company.
Provided Performance and Testing Services to the Olinger Simple Cycle
Project in Nevada, Texas. The project consisted of providing the
Test Director and testing personnel to conduct performance tests and write
the performance test report for a GE 7 EA simple cycle gas turbine.
Provided Performance and Testing Services to the
Hamakua Combined Cycle Project in Hamakua, Hawaii. The project
consisted of providing the Test Director and testing personnel to conduct
performance tests and write the test report for a GE LM-2500 combined cycle
gas turbine project.
Provided the Test Director and led the Babcock and Wilcox and Toshiba Test
Team for a performance test for the Coastal Saba Power Project in Farooqabad,
Pakistan.
Worked with the Babcock and Wilcox Test Team to prepare the test report and
make the presentation to Coastal Power. The-project-consisted of performance testing
and consulting for 150 MW oil fired conventional boiler and steam turbine test for
acceptance by the
owner.
|