Testing Services

PowerTek has assisted EPC Contractors and Owners to meet or exceed schedule and financial goals for the following projects:


Served as the Project Director for the NRG Energy Somerset relocation and reinstallation of a Pratt & Whitney FT-4 Combustion Turbine from Somerset, Massachusetts to Burlington, Vermont. The project scope included the evaluation of
equipment, disassembly, moving, site preparation, piling, foundations, reassembly, refurbishment, checkout, commissioning and startup and turnover of the unit to the operations group. The project was completed and operational in thirty days from start to finish.

Served as Startup Manager and Consulting Services to Burns & McDonnell for the Rio Bravo and Rosarito Projects in Mexico and the Zeeland Project in Zeeland, Michigan. The project consisted of simple cycle GE 7 FA Combustion Turbine and auxiliary equipment. PowerTek provided the coordination of the environmental, performance and environmental testing for the project and the final performance and environmental test report. Conducted the performance test and worked with GE performance testing personnel on the resolution of performance problems.

Served as Startup Manager and Consulting Services to Duke/Fluor Daniel for the Dearborn Simple Cycle Project Phase 1. The project consisted of simple cycle GE Combustion Turbine and auxiliary equipment. Supervised the construction support and startup team, which assisted in achieving first fire of combustion turbine within nine days of setting the turbine on the foundation.

Provided startup support and consulting to Duke/Fluor Daniel for the Ingleside Cogeneration Project in Corpus Christi, Texas. The unit consisted of two GE Frame 7 FA Combustion Turbines and an ABB Steam Turbine. Reviewed the schedule and provided input to enhance the time required to complete the overall project.

Provided operations and maintenance consulting and evaluation of the TMPA Gibbon's Creek Electric Generating Station, with water quality and performance degradation on a 480 MW GE turbine with a Combustion Engineering boiler. In addition, provided a condition assessment of the facility as part of an effort to determine the value of the asset to the various owners.

Conducted training classes for Duke Fluor Daniel design and project personnel on value engineering and project cost reduction for solid fuel, simple and combined cycle gas turbine turnkey projects.

Provided Testing and Consulting Services for Burns & McDonnell for the Tenaska Lakefield Junction Project. The Project consisted of furnishing the instrumentation, conducting the performance test and writing the. test report for six (6) GE 7 EA Simple Cycle Gas Turbines. The Owner required that testing be completed at base load on oil and gas and peak load on gas.

Provided Performance and Testing Services to Sargent and Lundy for the Reliant Energy Project in Aurora, Illinois. The project consisted of providing the Test Director and test personnel to conduct performance tests for three (3) GE 7 FA simple cycle gas turbines and six (6) LM-6000s and coordinate the activities of the environmental test company.

Provided Performance and Testing Services to the Olinger Simple Cycle Project in Nevada, Texas. The project consisted of providing the Test Director and testing personnel to conduct performance tests and write the performance test report for a GE 7 EA simple cycle gas turbine.

Provided Performance and Testing Services to the Hamakua Combined Cycle Project in Hamakua, Hawaii. The project consisted of providing the Test Director and testing personnel to conduct performance tests and write the test report for a GE LM-2500 combined cycle gas turbine project.

Provided the Test Director and led the Babcock and Wilcox and Toshiba Test Team for a performance test for the Coastal Saba Power Project in Farooqabad, Pakistan. Worked with the Babcock and Wilcox Test Team to prepare the test report and make the presentation to Coastal Power. The-project-consisted of performance testing and consulting for 150 MW oil fired conventional boiler and steam turbine test for acceptance by the owner.




 

01/04/03